Now loading.
Please wait.

HS- CLOCK System

Standard

Cuplock is a fully galvanised for appearance, multi-purpose steel system scaffold for all access, shoring and supporting vertical loads.

Unique node points which can lock up to four components in one easy hammer blow provide a wider range of applications.Node points are spaced on all standards at 500mm intervals to ensure that correct working lifts can be provided and handrails are positioned at the correct height.Four components are secured in one action ensuring the system is faster to erect than traditional methods.

6.jpg

These items form the vertical members of the scaffold and are made from 48.3 diameter x3.2mm thick high grade steel Tube .They incorporate a fixed bottom cup which is welded at 50mm untervals, with a capative moving top cup that can secure up to four components .These cups are the fixing points for the ledgers ,transoms and ancillary items .The location of the bottom cup , 80mm from the base of the standard ,improves the setructures strength and reduces the need for base-bracing in support structures .At the top of the standards ,there is a 150mm spigot that allows the vertical connection of further standards ,allowing the placement of universal jacks with various support components ,At the bottom and top of each standard , there is a corresponding drilled hole to allow tow standards to be botted together.

Code

Description

Size

 Weight

HSCS05

0.5M Standard

500mm

3.43kg

HSCS10

1.0M Standard

1000mm

6.00kg

HSCS20

2.0M Standard

2000mm

11.38kg

HSCS30

3.0M Standard

3000mm

16.34kg

standard.jpgstandard0.jpg立杆standard.jpg